The 15th of October 2010, Genoa Fieldbus Competence Centre has been certified PI Competence Center (PICC) by PI International for PROFINET®, PROFIBUS® and Profibus PA, entering at full right in the group of International Companies which are able to provide certified and competent Support on such networks.

Recently our Specialists Team has been enhanced with new qualified figures like "Certified Engineer".

Our Firm has today a Specialists Team with following profiles:

  • PITC-logo-120N. 6 Certified Profinet Engineers

  • N. 6 Certified Profibus Engineers

  • N. 1 Certified Profibus PA Engineer

  • N. 2 Certified Profisafe Designers

Strong of the experience matured by its Technical Team in more than 20 years of experience on field, our Firm is able to play the following interventions:

  • PI compositionVerification of the state on site of networks PROFINET®, PROFIBUS® and Profibus PA

  • Production of written reports highlighting any anomalies

  • Provision of Specialized Assistance and Technical Support in case of problems

  • Indication of the solutions to restore the correct operations of networks

  • Training Courses (see PITC - Profibus Profinet)

Our Firm proposes to the Final Users and to the Plants and Automation Builders a new AUDIT Service for Control and Verifications of the Plants using PROFINET®, PROFIBUS® and Profibus PA Technologies:

  • An AUDIT before the plant consignation

  • Interventions on installation site for a final AUDIT before the start-up of the plant

  • Production of an accepting report of the plant, made in autonomous and indipendent mode ("super-partes") than individual Suppliers

An AUDIT performed prior or during the start-up comport:

  • savings in management of the plant itself

  • a better production and efficency

  • a minimization, if not a cancellation, of the post starting interventions on site due to network and/or cabling problems

  • savings during the commissioning phase

 

 